Case Study: Lining Installation of Crossover Duct

Installation of lining to new sections of crossover duct in our Rotherham works

Cast hot face and insulation lining to newly fabricated sections of hot gas duct to replace damaged sections.

Once completed the sections will be shipped to site and changed over with the damaged sections thus causing minimal delay to site operations.